Ongoing Projects
 

Building the Future

Across Iran, we are delivering projects that will shape the foundations of tomorrow’s energy infrastructure. Every project underway reflects a renewed commitment to the highest standards of quality and performance.

ODCC’s Ongoing Projects

Discover our portfolio of ongoing projects across the energy industry.

Skip Navigation Links.

Development of Wellhead Facilities and Flowlines - Northern Sector of South Azadegan Oil Field

Development of Wellhead Facilities and Flowlines - Northern Sector of South Azadegan Oil Field

Project Info

Contract Type:

EPC

Project Duration:

20 months

Client:

Petroleum Engineering and Development Company (PEDEC)

Project Overview

  • Full EPC delivery of surface wellhead installations and associated gathering flowlines in the northern sector of the South Azadegan Oil Field, undertaken for Petroleum Engineering and Development Company to accelerate field production and streamline crude transfer operations.

 

Scope of Work

  • Process and pipeline engineering design
  • Procurement and supply of equipment and materials
  • Construction of wellhead facilities and related infrastructure
  • Installation of flowlines and interconnecting pipelines
  • Pre-commissioning and commissioning activities

 

Project Objectives

The project supports field production ramp-up by enabling crude oil extraction and transfer to the facility located in the northern section of the South Azadegan Oil Field.

  • Development of 59 production wells
  • Construction of 28 well pads
  • Designed production capacity of 129,000 barrels per day, contributing to the field’s overall planned output of 360,000 barrels per day